A high proportion of disruptions to machines and plant can be traced to electromagnetic influences. This is easy to fix – by observing rules for EMC-compliant panel building right from the design stage.
Based on the example of a SINAMICS G120 converter, the instructional video shows how to build a control panel according to EMC requirements on the basis of zones. In addition to a detailed description of the individual steps, you will also receive valuable practical tips on ways to avoid assembly errors.
The Directive regulates correct functioning of equipment. The term equipment refers here to one single apparatus or to stationary installations alike.
the EMC Directive’s scope does not include:
Safety and hazards of equipment, e.g. for persons, fields of equipment and their consequences, e.g. for persons, radio systems and telecommunications terminal equipment (covered by the R&TTE/RED Directive 2014/53/EU)
More information
Correct functioning of equipment is ensured by defining an adequate level with regard to electromagnetic compatibility. Accordingly, electrical equipment must be designed and manufactured so as to ensure that:
Annex 1 of the EMC Directive defines the following requirements:
Protection requirements:
Specific requirements for fixed installations:
More information
Within the scope of the new EMC Directive, manufacturers must also evaluate the electromagnetic compatibility of an apparatus on the basis of electromagnetic phenomena and ascertain whether the requirements of the Directive are satisfied. Evidence of electromagnetic compatibility drawing on test reports based on EMC tests or evaluation by expert appraisal is no longer sufficient.
To perform the risk analysis within the scope of the Directive, the European Committee for Electrotechnical Standardization (CENELEC) offers the CENELEC Guide 32 as assistance for operating equipment with low voltage.
More information
Equipment does not need to undergo a conformity evaluation if it is placed on the market solely for integration in a specific fixed installation. As control panels are generally conceived as components of fixed installations, a separate EU declaration of conformity and CE mark is not required for such equipment.
Important: They must nevertheless comply with the protection requirements of the Directive because the market surveillance authorities may demand proof of conformity, in particular if there are signs of non-conformity or in the event of complaints.
More information
The new EMC Directive 2014/30/EC does not contain any technical changes in comparison with the previous EMC Directive 2004/108/EC, which expired on April 20, 2016. Like with all NLF Directives, the essential changes refer to clear definition of the economic operators, marking of equipment and documentation.
Safety and hazards of equipment, e.g. for persons, fields of equipment and their consequences, e.g. for persons, radio systems and telecommunications terminal equipment (covered by the R&TTE/RED Directive 2014/53/EU).
More information