SIVACON 8PS

SIVACON S8 - Technical Planning Information

Totally Integrated Power | Planning manual

Summary

When a power distribution concept is to be developed which includes dimensioning of systems and devices, its requirements and feasibility have to be matched by the end user and the manufacturer. We at Totally Integrated Power have prepared this planning manual for the SIVACON S8 low-voltage switchboard to support you with this task.

 

The actual edition of this planning manual covers new available variants of the SENTRON product-portfolio, for example 3WA (air-circuit breaker) and 3NJ63 (switch-disconnector with fuses). Also integrated a new chapter on communication in the switchboard.

 

Contents:

System-Based Power Distribution | SIVACON S8 System Overview | Circuit-Breaker Design | Universal Mounting Design | In-Line Design, Plug-in | Fixed-Mounted Design | Reactive Power Compensation | Communication Connection | Further Planning Notes | Conformance to Standards and Design Verification | Technical Annex | Glossary and Rated Values

 

To receive the planning manual, enter your contact data. You will then receive the download link to the PDF.

Your data is safe with us – for details, read our privacy statement.