Date: June 21, 2022
Time: 9:00 a.m. or 4:00 p.m. CET (Berlin)
Language: English
Cost: Free
Duration: 2h
At the beginning of the electrical planning, the system planning must be carried out according to the regionally defined power supply system, or a suitable power supply system must be selected with the corresponding option. For this purpose, it is necessary to know and understand the effects and requirements of the different power supply systems, as these strongly influence the net structure and the choice of protective devices.
A special feature of the TN power supply system is the central earthing point. This holds great potential for danger as well as building damage in the long term if it is not properly integrated into the network.
In the course, the important basics are taught and solutions by examples will be discussed.
Content
Regulations and standards
Different cases of power supply systems
Influence to protective measures
Placement of Central Earthing Point (CEP) and the effects
Influence number of feeding sources to CEP
Prerequisites
- None
We are looking forward to meeting you in the event!
Speaker
FAQs
You have many options to participate in our webinars. As a participant you only need a stable internet access and an up-to-date browser. You will hear the sound through your speakers or headphones. You can access the link to the webinar via different web browsers. We have had the best experience with Mozilla Firefox and Google Chrome. No additional software needs to be downloaded to participate in the event. Access is also possible for mobile devices.