Set this page to
Go to Siemens in your region
Set this page to
Go to Siemens in your region
up to
(1200 ES)
Increase in hours / starts between planned inspections
Reduced life cycle costs
Fuel Type: Dual Fuel
Valid for the following frames: SGT6-5000F (FC, FD, FD2, FD3, F4, F5)
Gas turbine customers continue to look for products to increase availability while reducing maintenance costs. GT Interval extension products have been specifically developed to address both these needs. Interval extension products were developed to extend the duration between planned maintenance inspection intervals, which results in increased availability and in some cases, may eliminate certain type of inspections (e.g. combustor inspections) and reduced maintenance costs.
In the example below a unit operating at 25k EBH turbine inspection intervals now operates at 33k EBH turbine inspection intervals.
This change in operation provides the following benefits:
Note: EBH = Equivalent Base Load Hours, ES = Equivalent Starts, HGP = Hot Gas Inspection, MI = Major Inspection
Applicable Frames: SGT6-5000F (FC, FD, FD2, FD3, F4, F5)
Fuel Type: Dual fuel
Applicable Frames: SGT6-5000F (FC, FD, FD2, FD3, F4, F5)
Fuel Type: Dual fuel
The main product feature is the stage 1 and 2 advanced turbine F5EE hardware.
The following section highlights available recommended interval extension options for the turbine section.
For compressor and combustor interval extension products, please refer to the following:
It looks like you are using a browser that is not fully supported. Please note that there might be constraints on site display and usability. For the best experience we suggest that you download the newest version of a supported browser: