Utility Paralleling Systems

Low Voltage 300

SYSTEM FEATURES

  • All systems are UL listed
  • Selector switches for open/closed transition, automatic/manual paralleling of generator or utility sources, and automatic/manual retransfer to normal source provided
  • Active synchronization
  • Redundant PLC controls
  • Soft loading power transfer available

SYSTEM OPERATION

  • Choice of either momentary (100 milliseconds or less) paralleling with the utility or sustained paralleling for soft loading.
  • Paralleling of generator sets with the utility (upon return of the utility source after power interruption).
  • System testing in closed-transition mode with no interruption of the load. Generators are paralleled with the utility and the load is transferred to them. Upon completion of testing, the load is retransferred through closed-transition to the utility source without disturbance.
  • Configurable for peak shaving or utility-sponsored load curtailment programs.

Find an area sales representative near you

Downloads and support

Take advantage of our resources

Here you will find important information, documents, and addresses relating to our Russelectric portfolio.

Contact Us

Russelectric - A Siemens Business (Hingham, MA)
  • Toll Free: 1-800-225-5250

  • TEL: 1-781-749-6000

    Please note: If you already have an email contact of a Russelectric individual for your inquiry, please use that one. Aftermarket/Parts: russelectric.amsales.us@siemens.com (For service please refer to Field Services & Aftermarket on the main menu.)

Russelectric - A Siemens Business (Broken Arrow, OK)
  • Toll Free: 1-800-225-5250

  • TEL: 1-918-251-7877

    Please note: If you already have an email contact of a Russelectric individual for your inquiry, please use that one. Aftermarket/Parts: russelectric.amsales.us@siemens.com (For service please refer to Field Services & Aftermarket on the main menu.)